HYCHEM TL5 EPL is a chemically resistant high-build epoxy coating designed for use in environments where exposure to water, salt solutions, alkali and dilute mineral acids is required. The product is designed for applications AREAS OF USE HYCHEM TL5 EPL is designed for use in: 1. The waste water industry: Pipes, manholes, pump stations, drop structures, detention tanks and treatment plants. 2. The mining industry: Lining of walls in ammonium nitrate storage warehouses. 3. The food industry: Lining of bunds, pits, drains and effluent channels. 4. The petroleum industry: Corrosion protection of both concrete and steel assets.

Features and benefits

  • Designed as a high build coating via a plural spray system
  • Can be applied by brush, roller or trowel to small areas
  • Long pot life, good application times
  • High acid resistance
  • High caustic resistance
  • High fat resistance
  • Good hydrocarbon resistance
  • Good intercoat adhesion
  • Bonds to damp concrete
  • High impact strength

Application guidelines

Summary from the data sheet — follow the PDF on site.

Limitations

HYCHEM TL5 EPL is not suitable for use with concentrated sulphuric (98%), 30% plus nitric acid, 10% plus acetic acid and 20% plus phosphoric acid. For exposure to these materials, contact the HYCHEM technical department.

Surface preparation

Prior to the application of TL5 EPL, the substrate must be thoroughly prepared.

  • The concrete substrate must be firm, clean and dry with a minimum compressive strength of 25 MPa and a minimum surface tensile strength of 1.5 MPa.
  • New concrete must be allowed to cure for a minimum of 28 days.
  • Remove all surface laitance, contaminants, existing coatings, curing compounds and any weak or loose materials.

All organic matter, weak surfaces and poorly consolidated material must be removed. This is ideally carried out by water blasting with equipment delivering a minimum of 4,000 psi for new concrete.

Cleaned, badly deteriorated surfaces are often ready for coating, providing a natural undulating profile. Cleaned, new concrete surfaces tend to produce a plethora of blow holes which when coated give rise to coating blisters.

Correct treatment of this problem involves a number of issues.

Firstly, coating application must take place when substrate temperatures are falling and must not occur under direct sunlight.

Secondly, concrete porosity needs to be sealed with a coat of HYCHEM E500P primer or Hychem E300.

Thirdly, visible blowholes can be sealed with a thixotropic paste such as HYCHEM E500T. This can be applied as a surface screed or merely used to plug individual blow holes.

Application of the subsequent HYCHEM TL5 EPL should be after the screed has surface hardened and within a total period of 24 hours. In most existing concrete structures after adequate preparation, TL5 EPL does not always require the use of a primer.

Pre-conditioning product

It is important to note that even when the application environment is warm, products which have been stored in cold or cooler conditions should always be pre-conditioned ideally to 20–25°C to ease mixing, application and help avoid other potential issues such as amine bloom or blushing.

Applying a cold product in a warm environment is not recommended.

Coating application

Due to the rapid cure and resultant short potlife, it is recommended that the material is applied using a plural component airless spray with static mixing head. Consult your spray unit supplier for detailed specifications.

Applying HYCHEM TL5 EPL to small surfaces areas, this can be carried out by a trowel.

Coverage and spread rate

With correct choice of equipment, the coating can be applied at 65 sqm/hour at a coating depth of 3mm, using a volume output of 200 litres/hour.

INSPECTION

A detailed inspection test plan will be agreed upon depending on the application type. Testing for example of adhesion and shore hardness might be carried out.

Clean up
  • Clean equipment with epoxy diluting solvents such as Xylene.
  • Hard, cured material will need to be mechanically removed.
  • Use soap and water to wash hands.
Packaging

Hychem TL5 EPL is available in 60 litre kits, 2 x 20 litre resin and 1 x 20 litre hardener.

Health and safety information

Epoxy resin products are skin sensitizing and can have a caustic reaction. Read MSDS Data Sheet prior to use. Wear protective gloves, clothing and protective eyewear when using. Wash hands before eating and avoid breathing vapours.

Field support

Field support where provided, does not constitute supervisory responsibility. Suggestions made by HYCHEM either verbally or in writing may be followed, modified or rejected by the owner, engineer or contractor since they and not HYCHEM are responsible for carrying out procedures appropriate to a specific application.

Customer responsibility

The technical information and application advice given in this publication is based on the best information available at the time of print. As the information herein is of a general nature, no assumption can be made as to the product suitability for a particular use or application and no warranty as to its accuracy, reliability or completeness either expressed or implied is given other than those required by Commonwealth or State Legislation.

The owner, his representative or the contractor is responsible for checking the suitability of products for their intended use.

Technical data

Technical data for Hychem TL5 EPL
PropertyValueUnit / method
AppearanceResin: white paste Hardener: black paste Mixed: grey paste
Mix ratio2 parts Resin to 1 part Hardener by volume
Specific gravityResin: 1.25 Hardener: 1.05 Mixed: 1.2
Working time @20°C40minutes
Gel time @20°C60 mins
Tack free time8hours
Cure schedule @20°C — 6 hour cure30 Shore D
Cure schedule @20°C — 8 hour cure60 Shore D
Cure schedule @20°C — 24 hour cure75 Shore D
Cure schedule @20°C — 7 day cure80 Shore D
Compressive strength70MPa
Tensile strength20MPa
Bond strength3.8 MPa (concrete failure)
Intercoat adhesion @24 hours8 MPa substrate failure

From the technical data sheet, updated .

Chemical resistance

HYCHEM TL5 EPL is formulated to have good resistance to dilute sulphuric acid. Immersion in the chemical results in a minimal absorption of 0.5% after 6 months exposure. Organic acids

Acetic acid 10% Good
Lactic acid 10% Good
Citric acid 15% Very good
Mineral acids
Hydrochloric acid 20% Excellent
Sulphuric acid 20% Excellent
Nitric acid 20% Good
Phosphoric acid 20% Good
Caustic materials
Sodium hydroxide 20% Excellent
Ammonium hydroxide 20% Very good
Oxidizing materials
Sodium hypochlorite 12% Good
Hydrogen peroxide 10% Good
Salts
Ammonium nitrate Excellent
Ammonium sulphate Excellent
Ammonium phosphate Excellent
Sodium chloride Excellent
Ferric chloride Excellent
Hydrocarbons
Unleaded petrol Good
Kerosine Good
Turpentine Good
Toluene Fair
Xylene Good
Oxygenated and chlorinated solvents
Acetone Limited to spillage
Methyl ethyl ketone Limited to spillage
Methylene chloride Poor
Carbon tetrachloride Limited to spillage
  • Resistant
  • Spills or short contact
  • Not resistant

Questions about Hychem TL5 EPL

How long does Hychem TL5 EPL take to cure?

Tack free time: 8 hours. Cure schedule @20°C — 6 hour cure: 30 Shore D. Cure schedule @20°C — 8 hour cure: 60 Shore D. Cure schedule @20°C — 24 hour cure: 75 Shore D. Lower temperatures extend these times; the data sheet gives the conditions.

Where is the Hychem TL5 EPL data sheet?

Download the Hychem TL5 EPL technical data sheet (PDF), edition 12 May 2016. For the safety data sheet, request it and we send it the same day.

Who installs Hychem TL5 EPL?

Hychem TL5 EPL is supplied by Hychem and laid by an approved applicator from our national network — jobs of any size, in every state. How supply and installation works.