Sydney Fish Market

Blackwattle Bay, Sydney NSW · 2026 · Food and beverage

All back-of-house processing floors at the new Sydney Fish Market — hygienic polyurethane cement for hot washdowns and cold rooms.

Every item of food produced in Australia has to be produced on a hygienic floor. At the new Sydney Fish Market at Blackwattle Bay, that floor is Hychem Hycrete: the back-of-house processing areas where the catch is landed, prepared, washed down hot every day and held cold overnight.

  • 12,000 m²of processing floor under one roof
  • 9 mmHycrete polyurethane cement
  • 100 mmcoving at every wall
  • 2026market opening

The brief

Twelve thousand square metres of processing floor under a single roof, with wholesale, retail and restaurant operations above and around it. The floor had to take forklift traffic, fish oils and blood, hot washdown and chilled storage, and be down before the market opened.

The system

Nine millimetres of Hycrete polyurethane cement, laid to falls with cast-in trench drains and coved a hundred millimetres up every wall so there is no joint for bacteria to hold. Externally, a trafficable membrane with an aggregate finish for slip resistance under the loading canopies.

Hycrete is manufactured forty minutes from the site. That meant batch consistency across 12,000 m² and technical people on the floor during the pour.

Chris BauerFlooring Director

Why it matters

Hycrete is manufactured in Sydney, forty minutes from the site. That meant colour and batch consistency across 12,000 m², technical people on site during the pour, and the confidence to specify the same system across cold rooms, wet areas and corridors.

The film

In pictures

  • Hycrete polyurethane cement floor across the Sydney Fish Market processing hall
  • Trench drains cast into the Hycrete floor
  • Coving being formed at the floor–wall junction
  • Self-levelling compound being poured
  • Mixing on site — three-part polyurethane cement
  • Crew applying the topcoat
  • Wet drain after washdown
  • Operational corridor in service
  • External membrane over the loading areas
  • External aggregate finish being laid
  • Hychem pails on site

Specified on this project