Skip to content
(02) 4646 1660 Contact

Hychem TL2 Flash Novolac — Flash set Novolac epoxy binder for floor toppings requiring high impact and fat resistance

Product description

HYCHEM TL2 Flash is a specialist, solventless epoxy binder that combines a very fast cure time with very high impact and fat resistance. The product serves a multipurpose function, it may be combined with aggregate to produce a topping or it may be used as a sealer for existing surfaces. HYCHEM TL2 Flash is designed for use where a fast cure, short down time resin system is required that will withstand hot fats. It is a companion product to HYCHEM E300SLF, yet with a faster curing system and improved surface blush in adverse cold, damp environments.

Typical applications

  • Abattoirs
  • Bakeries
  • Commercial kitchens
  • Cereal producers
  • Confectionery
  • Dairy products
  • Fast food retailing
  • High traffic loading docks
  • Poultry processing
  • Smallgoods manufacturing
  • Snack food manufacturing
  • Supermarket rotisseries

Features and benefits

  • High resistance to hot vegetable and animal fats
  • High resistance to petroleum oils and solvents
  • Abrasion and impact resistant
  • Hard wearing and durable.
  • High compressive strength
  • Low odour, will not taint food
  • Non flammable, no fire hazard
  • Fast curing, short down times
  • Can be applied as a topping and as a coating

Application guidelines

Summary from the data sheet — follow the PDF on site.

Surface preparation
  • Epoxy toppings can exert considerable shear forces on the underlying concrete substrate due to differential thermal movements. It is most important that the concrete surface is adequately prepared. The cement paste layer and any surface coatings already in existence need to be removed. This is best carried out using captive shot blasting, grinding or scarifying.
  • The resultant surface should have a minimum tensile strength of 1.5 MPa and a minimum compressive strength of 25 MPa.
  • Weaker surfaces need to be upgraded with a sub layer of a HYCHEM GP epoxy mortar.
Mixing
  • In a clean container, mix HYCHEM TL2 Flash liquid components (resin and hardener @ 2:1) using a helical mixer at a speed of 500 rpm until the mix becomes homogenous (1–2 minutes).
  • Add HYCHEM SL aggregates at a ratio of 1:1 by volume, gradually to the mix whilst still mixing.
  • Move the mixer around from side to side and top to bottom and scrape the sides of the mixing vessel to ensure thorough mixing.
Application

Sub layer

Apply a sub layer of HYCHEM GP Epoxy epoxy mortar to achieve the desired falls to drains if time allows.

Otherwise, blend quartz aggregate and TL2 Flash at a ratio of 3-4:1 by volume and trowel out.

TL2 Flash surface topping

  • Apply the resin aggregate mix to the floor using a notched trowel at a coverage rate of 2 litres/sqm.
  • Into the wet TL2 Flash, broadcast antislip quartz aggregate generously into the surface until a dry beach finish is obtained without surface humps. Aggregate size should be 16/30 or 18/40.
  • Once cured, sweep off and vacuum excess loose aggregate.
  • Apply a sealcoat of TL2 Flash in the desired colour at a coverage rate of 2 sm/l.
  • Lightly broadcast hard wearing aluminium oxide non-slip aggregate into the wet surface.
  • Apply a final coat of HYCHEM SF12 Novolac epoxy coating when the base coat has cured sufficiently to be able to apply the seal coat. Coverage around 4-6 sqm/l.

Antislip rating: The above method will yield an antislip rating of a minimum R11 when tested according to the ramp method.

A rating of R12 to R13 can be gained by broadcasting small amounts of 24–36 grit alumina into the TL2 Flash seal coat.

Jointing

Joints in the floor need to be reflected in the epoxy topping.

When the topping has cured, the surface needs to be sawcut and an epoxy joint sealant such as HYFLEX NS applied.

Clean up

Xylene or Solvent BGE can be used for cleaning tools and equipment before the mixed compound begins to harden.

Xylene can be used for cleaning tools and equipment before the mixed compound begins to harden.

Coverage

Using the correct amount of epoxy is critical to the performance of the final floor. A tendency to often overload the aggregate relative to the resin component can have dire effects on the longevity of the finished topping. A 5 mm floor will require a minimum of 2 litres of TL2 Flash per sq. metre.

  1. Primer, 5–8m² per litre depending on the porosity of the substrate.
  2. Scratch coat. 0.75 litre per sq metre.
  3. Trowelled topping, 2 litres per sqm per 5m of topping depth.
Pigmentation

Epoxy pigments are available from HYCHEM to provide a range of colours to flooring finishes. These pigments can be affected by chemical reagents, it is the responsibility of the user to ensure that the pigments used are suitable for the project being considered.

Pigments supplied are meant for industrial use and will not necessarily comply with architectural colour standards.

Packaging

Available in 12, 30 and 60 litre kits.

Available in 4, 16, 80 and 800 litre kits.

Shelf life

12 months from date of manufacture, stored under shelter at 25 °C in original unopened container.

12 months from date of manufacture, stored under shelter at 25 °C in original unopened container.

Physical properties

Physical properties for Hychem TL2 Flash Novolac
PropertyValueUnit / method
Mix Ratio – volume2:1 resin to hardener
Specific gravity1.15:1
Pot life10minutes
Tack free time2hours
Cure time4hours
App. temperature0 to 25 °C
Service temperatureUp to 80 °C
Compressive strength80 MPa (6:1 w/w) quartz mortar
Compressive Strength70MPa
Applied thickness100 micron – 150mm

Chemical resistance

The chemical resistance of a material can be determined by the wt gain of a sample immersed in the chemical. The greater the wt gain, the poorer the resistance of the material. The table below gives the relative resistance of HYCHEM TL2 Flash relative to other available epoxy binders. A value of 100 is equal to an absorption gain of 3%.

CHEMICAL GP E300 E300 SL E300SLF TL2 Flash
15% Acetic acid 80 60 60 25 25
20% Caustic soda 0 0 0 0 0
20% Phosphoric acid 25 40 40 60 60
12% Hypochlorite 15 15 15 15 15
Xylene/butanol blend 200 200 125 20 20

Questions about Hychem TL2 Flash

Where is Hychem TL2 Flash used?

Hychem TL2 Flash is used for: Abattoirs; Bakeries; Commercial kitchens; Cereal producers; Confectionery; Dairy products.

How long does Hychem TL2 Flash take to cure?

Tack free time: 2 hours. Cure time: 4 hours. Lower temperatures extend these times; the data sheet gives the conditions.

How thick is Hychem TL2 Flash applied?

Applied thickness: 100 micron – 150mm.

Where is the Hychem TL2 Flash data sheet?

Download the Hychem TL2 Flash technical data sheet (PDF). For the safety data sheet, request it and we send it the same day.

Who installs Hychem TL2 Flash?

Hychem TL2 Flash is supplied by Hychem and laid by an approved applicator from our national network — jobs of any size, in every state. How supply and installation works.

Similar systems

Other Heavy Duty Industrial Solutions systems.

All Heavy Duty Industrial Solutions