Skip to content
(02) 4646 1660 Contact

Food and beverage processing flooring

For food and beverage processing, specify a seamless polyurethane cement floor coved up the walls: it takes hot washdown, freezing, fats, blood and acids, and cleans without harbouring bacteria. Hychem Hycrete PU-SL is on the new Sydney Fish Market's processing floors; epoxy toppings suit dry stores and packing.

What the floor has to handle

Cleaning
daily hot-water and chemical washdown
Chemicals
lactic and acetic acids, fats, blood, sugars, caustic cleaners
Temperature
freezers and cold stores through to hot processing
Traffic
forklifts, pallet jacks, trolleys, constant foot traffic
Hygiene
seamless and impervious, coved at walls, falls to drains
Rules
FSANZ Standard 3.2.3; sites run HACCP food-safety plans

3 products

Standards that apply

Standards that apply — Food and beverage processing flooring
StandardTitleWhat it means for the floor
FSANZ Standard 3.2.3Food Premises and Equipment (Food Standards Code)Floors must be able to be effectively cleaned, must not absorb grease, food particles or water, and must be laid so water does not pool.
AS 4674-2004Design, construction and fit-out of food premisesWithdrawn, but still referenced by councils: impervious, cleanable floors and coved junctions where floor meets wall.
HACCPHazard Analysis and Critical Control PointA food-safety management system, not a floor rating. The floor has to support the plan's cleaning regime; certification of a product is a separate matter.
AS 4586-2013Slip resistance classification of new pedestrian surface materialsClasses a new floor: P0–P5 on the wet pendulum, R9–R13 on the oil-wet ramp, A–C for wet barefoot areas. Ask for the class the area needs, not just "non-slip".

Which product holds which certificate: certifications and approvals.

FAQs about food and beverage processing flooring

Polyurethane cement or epoxy for a food factory?

Polyurethane cement for wet processing areas with hot washdown, freezing temperatures, fats and acids; epoxy for dry packing and storage areas. Most plants use both.

Is there a HACCP-certified floor?

HACCP is a food-safety management system, not a floor rating. Some floor products hold HACCP International certification — ask us which Hychem systems do for your project.

How thick should the floor be?

Hycrete PU-SL is laid at 6 mm as a broadcast anti-slip floor or 4 mm self-levelling. The heavy-duty Hycrete topping runs 6–9 mm and withstands up to 130 °C at 9 mm.

Can it go on new concrete?

Hycrete PU-SL can be applied to 7-day-old concrete and to a slightly damp surface, which keeps a new build on programme.

How long before production restarts?

At 25 °C Hycrete PU-SL takes foot traffic in 12–20 hours, heavy traffic in 2 days and chemical exposure in 7 days.