Skip to content
Back to the app
(02) 4646 1660 Contact

Bosch Rexroth

Marsden Park NSW · 2026 · Warehousing and manufacturing

Bosch Rexroth chose Hychem again for its new 8,000 m² facility, more than ten years after the first: self-levelling epoxy with a slip-resistant topcoat.

Bosch Rexroth first chose Hychem floors more than ten years ago. For its new facility at Marsden Park in Sydney's west, it chose Hychem again.

  • 8,000 m²of production floor
  • 10+ yearssince the first Hychem floor
  • 1,000 m²final stage in E300SL and SF20
  • 2026completed

The brief

A new home for Bosch Rexroth Australia's manufacturing, engineering and sales operations: 8,000 m² of production floor under gantry cranes. The floor needed slip resistance, impact resistance and easy cleaning.

The system

Hychem E300SL self-levelling epoxy, finished with Hychem SF20 epoxy topcoat. The final 1,000 m² completed the 8,000 m² floor in 2026.

We did the same flooring for Bosch over 10 years ago. They are so happy with it, we are here doing it again.

Hychemon site at Bosch Rexroth

Why it matters

A client coming back after a decade is the plainest test of a floor. The first one did its job for more than ten years; the second is the same system, specified again.

In pictures

  • The finished epoxy floor across the production hall
  • The pour front: self-levelling epoxy spread and spiked across the slab
  • Hychem SF20 epoxy topcoat
  • The finished floor under the gantry cranes
  • Rolling the wet coat

Specified on this project